Client portal
See what your pilot workspace can look like
Already have portal credentials? Log in — you do not need the sample. New here? Explore the sample workspace below, or request an account for your own sites.
Site overview
What a live client sees at a glance for one plant — sample data only.
- Industry
- Municipal drinking water
- Location
- Gulf Coast, USA
- Influent
- Surface water · seasonal turbidity and fine solids events
- Target constituent
- Fine suspended solids and organics ahead of IX / GAC
- Design flow
- Up to 600 GPM (3 × 200 GPM CAST modules in parallel)
- Status
- Pilot in progress
- Modules online
- 3
- Pilot window
- Pilot window — illustrative for evaluators
CAST is teed into the raw influent ahead of clarification. Bypass valve installed for the pilot. No additional power requirements for the CAST modules.
- Influent teed ahead of existing clarification — plant train unchanged
- Three identical CAST modules on a parallel manifold
- Pressure sensing at influent and plant end; WQ between modules
- Pilot bypass valve in place so the plant can run as before
- Key pilot metrics reviewed with Deloitte as independent advisor
94%
TSS removal (pilot window)
Pilot window average
1.8 NTU
Turbidity (post-CAST)
Pilot window average
3
Modules online
Parallel manifold · up to 600 GPM
None
Additional power for CAST
Passive capillary pretreatment
Create an account
Unlock a workspace for your sites
Tell us who you are. Chris and John will provision portal access for evaluation or active pilots — including private results and documents that stay off the public site.
