Flotration Technologies

Client portal

See what your pilot workspace can look like

Already have portal credentials? Log in — you do not need the sample. New here? Explore the sample workspace below, or request an account for your own sites.

Evaluator preview — demo data only. Live pilot results and private documents appear after Flotration provisions your account.

Site overview

What a live client sees at a glance for one plant — sample data only.

Industry
Municipal drinking water
Location
Gulf Coast, USA
Influent
Surface water · seasonal turbidity and fine solids events
Target constituent
Fine suspended solids and organics ahead of IX / GAC
Design flow
Up to 600 GPM (3 × 200 GPM CAST modules in parallel)
Status
Pilot in progress
Modules online
3
Pilot window
Pilot window — illustrative for evaluators

CAST is teed into the raw influent ahead of clarification. Bypass valve installed for the pilot. No additional power requirements for the CAST modules.

  • Influent teed ahead of existing clarification — plant train unchanged
  • Three identical CAST modules on a parallel manifold
  • Pressure sensing at influent and plant end; WQ between modules
  • Pilot bypass valve in place so the plant can run as before
  • Key pilot metrics reviewed with Deloitte as independent advisor
Deloitte verified

94%

TSS removal (pilot window)

Pilot window average

Deloitte verified

1.8 NTU

Turbidity (post-CAST)

Pilot window average

3

Modules online

Parallel manifold · up to 600 GPM

None

Additional power for CAST

Passive capillary pretreatment

Create an account

Unlock a workspace for your sites

Tell us who you are. Chris and John will provision portal access for evaluation or active pilots — including private results and documents that stay off the public site.

Opens email to Chris with John on CC — no spam, no public signup wall.