Flotration Technologies
HomeAll documents
Flotration TechnologiesCAST

Leave-behind

Operator & engineer brief

One page for the people who run the plant — how CAST tees in, what it does to the water, where savings show up, and how a pilot works. Print or download PDF to share.

Flotration Technologies · CAST

How CAST fits your treatment train

Modular pretreatment · No additional power · Plant stays · Pilot first · Patent pending

Non-confidential · August 2026 · Not a technical specification or offer of terms

What it is

  • Modular pretreatment that tees into your influent ahead of the treatment you already own — clarifiers, flotation, RO, ion exchange, GAC, or membranes.
  • Capillary Action Separation Technology: hydrophilic vessels lift fine solids, oils, and organics at low energy; selective media capture target constituents as the train is matched to your water.
  • Compact field footprint; three modules ship on a standard 48×40 in pallet. No additional power requirements. No moving parts. In pilot, a bypass valve returns flow to the plant without CAST.
  • Delivered as a service (lease-plus-usage). Always proven first on your stream in a paid pilot. Patent pending.

What it does to the water (expected — site-specific)

  • TSS removed: 90–99% · Turbidity: typically ~1–3 NTU · Oil & grease (when present): >90%
  • Hydrophobic COD fraction: ~30–60% reduction · Membrane feed quality: SDI₁₅ target below 3
  • Downstream IX / GAC: longer run length and less fouling load (bench work has shown multi-fold IX extension ahead of resin)
  • Fouling service: lift inner workings and pressure-wash as needed — aluminum construction is essentially non-fouling

Where the economics show up

  • Produced water / industrial: reclaim water on site instead of trucking hundreds or thousands of miles to deep injection — major haul-off and disposal cost reduction.
  • Municipal & reuse: steadier feed through weather events; protect membranes; polish effluent for reuse; defer CapEx on the existing plant.
  • PFAS-impacted streams: pretreatment ahead of IX or GAC to cut media replacement (CAST concentrates/removes; it does not destroy PFAS).
  • Challenging matrices / leachate: fine colloidal solids and mixed constituents of concern that overload conventional clarification.

How engagement works

  • Short intake → 60-minute scoping call → one-page ROI from your costs → paid on-site pilot.
  • After proof-up: water-as-a-service — Flotration keeps 50% of documented annual savings; you keep 50%. No large CapEx purchase of the unit to start.

What CAST is not

  • Not a full plant replacement · Not disinfection · Not standalone desalination · Not a guarantee without a pilot on your water.
  • Complementary to existing operators and assets — designed to strengthen the train you already run.